Mooring Buoy Instalation Six
The Helix mooring has been twisted almost completely into Bonaire's sand and rubble substrate, leaving just the tip and the eye through which a volunteer has just finished attaching the rope and float for the completed buoy mooring system
This image is available for use with credit to the photographer for non-commercial use. If you are interested in commercial use, please contact photobank@coral.org [14].
Photo taken inside the Bonaire Marine Park
Links:
[1] http://www.coral.org/_48
[2] http://www.coral.org/_253
[3] http://www.coral.org/_196
[4] http://www.coral.org/_197
[5] http://www.coral.org/_252
[6] http://www.coral.org/_253
[7] http://www.coral.org/_255
[8] http://www.coral.org/_256
[9] http://www.coral.org/_257
[10] http://www.coral.org/_258
[11] http://www.coral.org/_255
[12] http://www.coral.org/node/5500
[13] http://www.coral.org/_254%3Fsize%3D_original
[14] mailto:photobank@coral.org