Mooring Buoy Instalation Five
Two rangers hold the drilling mechanism and the combination bit and mooring, and direct the future mooring into the substrate. Some stability is provided by the lift bag, which is being monitored by a volunteer.
This image is available for use with credit to the photographer for non-commercial use. If you are interested in commercial use, please contact photobank@coral.org [14].
Photo taken inside the Bonaire Marine Park
Links:
[1] http://www.coral.org/_48
[2] http://www.coral.org/_252
[3] http://www.coral.org/_195
[4] http://www.coral.org/_196
[5] http://www.coral.org/_197
[6] http://www.coral.org/_252
[7] http://www.coral.org/_254
[8] http://www.coral.org/_255
[9] http://www.coral.org/_256
[10] http://www.coral.org/_257
[11] http://www.coral.org/_254
[12] http://www.coral.org/node/5500
[13] http://www.coral.org/_253%3Fsize%3D_original
[14] mailto:photobank@coral.org