Mooring Buoy Instalation Five

100.3k | 600 x 908
January 1, 2013
Description:

Two rangers hold the drilling mechanism and the combination bit and mooring, and direct the future mooring into the substrate. Some stability is provided by the lift bag, which is being monitored by a volunteer.

To save the full sized image to your computer right click the Full Size link above (or control click on a Mac) and choose "Save Image As".

Search the Photo Bank